Assessment Criteria:

1.        Work instructions are read and interpreted to determine job requirements.

2.        Tools and testing devices needed to carry out the installation work are selected in accordance with established procedures and checked for correct operation and safety.

3.        Materials necessary to complete the work are obtained in accordance with job requirements

4.        Equipment and components are prepared for correct sequential installation.

5.        OSH policies and procedures for installation are followed according to manufacturer’s specifications.