Assessment Criteria:
1. Cable routes are determined and planned in accordance with network design and actual installation site.
2. Network materials necessary to complete the work are identified and obtained in accordance with established procedures and checked against systems    
    requirements
3.  Tools, equipment and testing devices needed to carry out the installation work are obtained in accordance with established procedures and checked for
    correct operation and safety
4.   Appropriate personal protective equipment is used and OHS policies and procedures are followed
5.   Copper cable splicing is performed based on Electronic Industries Alliance/Telecommunications Industry Association (EIA/TIA)  standards
6.   Network cables and cable raceway are installed in accordance with established procedures and installation requirements
7.    Installation work is performed and is checked to ensure no unnecessary damage has occurred and complies with requirements
8.                                                     OHS standards and 5S principles are followed according to enterprise requirements
9.    Excess components and materials are disposed of based on WEEE directives and 3Rs waste management program.